Monet
What we did
Industry
Architecture
Description
A sculptural kitchen defined by its stone.
This project began with a single idea: the stone. As the sole design driver, the selected slab set the tone for the entire space: bold, expressive, and timeless. Working closely with a specialist kitchen designer, we shaped a piece that is as functional as it is artful. Every detail was considered to let the stone speak.
Currently underway — full reveal coming soon.

